Local Development Framework Banner
 TEXT ONLY HOME   |   S C I   |   L D Ds   |   L D S   |   S E A / S A CONTACT US"
LDF Home Page
LDF Process
Local Dev. Docs
Alternative Sites
Background Docs
Brinsbury
Core Strategy
Core Strategy Review
Design Guidance
Design Statements
Dev. Control Policies
Post Hearing
Resp. Statements
Position Statement
Public Examination
Alternative Policies
Facilitating Appropriate Dev.
Future Prosperity of Horsham
Gypsies andTravellers
SHLAA
Interim Statement
Parish Plans
Policy Framework
Proposals Map
Representations
Reserve Housing
Allocations of Land
Storrington Diamond
Strategic Planning Advisory Group
Supplementary Docs
West of Crawley
West of Horsham






DOWNLOADS Acrobat Reader
Winzip Utility




Horsham District Local Development Framework - Post Hearing Annual Monitoring - home  >  Local Development Documents  >  Post Hearing

POST-HEARING CHANGES PRODUCED BY HORSHAM DISTRICT COUNCIL FOR THE EXAMINATION

During the Examination Hearings from the 4th September 2007 to 7th September 2007, the Council agreed to submit its suggested changes to certain parts of the General Development Control Policies Document to reflect the discussions which took place, for consideration by the Inspector.

The Council's Post-Hearing Changes have been produced if required, shortly after each session. These identify the changes the Council would definitely wish to make following the hearing, but does not include those changes the Council did not propose. These can be viewed by opening the following links:

Post-Hearing Submission Policy DC 1

Post-Hearing Submission Policy DC 22

Post-Hearing Submission Policy DC 30



23rd November 2017


Storrington


Leonardslee Pond


The Bus Garage


Amberley



HOME   |   S C I   |   L D Ds   |   L D S   |   S E A / S A CONTACT US